
Logistics
Ferentino
Ferentino – FR | Italy
The logistics complex will comprise 38,876 sqm of warehouse space and 1,092 sqm of offices, designed to ensure high standards of functionality, safety and operational efficiency. The facility will feature 40 loading bays, 15 HGV parking spaces, and 100 car parking spaces, ensuring smooth traffic flow for both heavy vehicles and staff. The complex will integrate a 4 MW photovoltaic system, contributing significantly to the production of renewable energy and to reducing the overall environmental impact.
38.876
sqm Warehouse
1.092
sqm Offices
40
Loading bays
100
Car parking spaces
4
mw
Photovoltaic system

Aim of the work:
Engineering, Design & Construction
Start:
05 / 2025
End:
04 / 2026
The building is
LEED Platinum
