Logistics

Andreas Stihl Milan

ANDREAS STIHL S.P.A
Milano – MI | Italy

Construction of a logistics warehouse consisting of a building measuring 4,000 sqm with 3 loading bays and 1,800 sqm of office space. The building is in steel and contemplates metal panel roofing and walling. The project includes MEP installation works, offsite works and all external works (plot area 7,000 sqm).

7.000

sqm Area

5.800

sqm Built

4.000

sqm Building

1.800

sqm Offices

3

Loading bays

Aim of the work:

Procurement and Construction

Customer:

Andreas Stihl S.p.A.

Start:

01 / 2003

End:

01 / 2004

The building is BREEAM
certified Very Good.