Logistics

Ferentino


Ferentino – FR | Italy

The logistics complex will comprise 38,876 sqm of warehouse space and 1,092 sqm of offices, designed to ensure high standards of functionality, safety and operational efficiency. The facility will feature 40 loading bays, 15 HGV parking spaces, and 100 car parking spaces, ensuring smooth traffic flow for both heavy vehicles and staff. The complex will integrate a 4 MW photovoltaic system, contributing significantly to the production of renewable energy and to reducing the overall environmental impact.

38.876

sqm Warehouse

1.092

sqm Offices

40

Loading bays

100

Car parking spaces

4

mw

Photovoltaic system

Aim of the work:

Engineering, Design & Construction

Start:

05 / 2025

End:

04 / 2026

The building is
LEED Platinum